Free estimates on every fence, deck and pergola project. Request yours
For contractors Showroom hours Financing (801) 998-2912
(801) 998-2912 Free estimate
Helical Pier Installation for Utah Decks and Pergolas
Deck Features

Helical Pier Installation for Utah Decks and Pergolas

Build on a foundation that grips Utah's shifting soil from day one. Mountain West Fence & Deck Supply installs helical piers for deck builders and homeowners across the Wasatch Front.

Why Choose Us

What Are Helical Piers and Why Utah Projects Need Them?

A helical pier is a galvanized steel shaft with one or more helical blades that screws directly into the ground, similar to a large screw, until it reaches load-bearing soil below the frost line. Once installed, it becomes a permanent, non-shifting support point for deck posts, pergola footings, or steel deck framing, without the digging, forming, or multi-day cure time a concrete footing requires.

Any deck installation is only as strong as what sits underneath it, and Utah's ground gives foundations a hard time. Expansive clay soils near Saratoga Springs and Utah Lake swell and shrink with moisture, while rocky, sloped lots around Park City and Heber City make traditional excavation slow and expensive. Homeowners setting posts for a wood pergola, fiberglass pergola, or aluminum pergola often choose helical piers over buried posts specifically because the piers won't heave or shift as the ground freezes and thaws each winter.

As a fence company and deck builder supply source that's served the Wasatch Front since 1989, we stock helical piers alongside ground screws for lighter-load applications, so you can match the foundation to the project instead of forcing every job into a one-size-fits-all footing.

Benefits of a Helical Pier Foundation

Choosing a helical pier system over a poured footing changes what your project timeline and long-term maintenance look like. Here's what Utah homeowners and contractors gain:

  • No concrete curing time, so framing and deck construction can continue the same day
  • Rated below Utah's frost line, resisting heave through repeated freeze thaw cycles
  • Minimal excavation, a practical choice for tight yards, sloped lots, or landscaped areas
  • Load tested during installation, so the foundation's rating is confirmed before framing begins
  • Compatible with steel deck framing, aluminum deck framing, or traditional wood post construction
  • Pairs well with a RainEscape deck drainage system to keep the space under a raised deck dry and usable
Foundation Supplies & Installation

Why Utah Homeowners Choose Mountain West for Helical Pier Installation

Whether you're a deck builder running several jobs a season or a homeowner tackling a first raised deck, the foundation is not the place to cut corners. Here's what you get working with our team.

Steel Rated for Utah Ground

Our helical piers are galvanized to resist corrosion and rated for the load requirements typical of Utah's clay, rocky, and mountain soils.

Same Day Availability

Our showrooms stock helical piers alongside our full range of decking supplies and fencing supplies, so most projects never wait on a special order.

Contractor Pricing

Contractors get trade rates on helical piers, ground screws, and framing systems, with price matching available on written estimates from other suppliers.

Free Estimates & Load Planning

We help size and layout your pier foundation before you buy, so your deck or pergola posts land exactly where they need to for a level, code-ready build.

Bilingual, Hands On Guidance

Our English and Spanish speaking team walks first-time DIYers and seasoned crews through the same process, from soil questions to installation tools.

Two Convenient Showrooms

Visit us in South Salt Lake or at our Springville location to see helical pier samples and talk through your project in person.

How It Works

Our Helical Pier Installation Process

A helical pier foundation moves faster than a poured one, but it still follows a careful sequence to make sure every post lands on solid, load-tested ground.

  1. 1

    Site Evaluation & Soil Assessment

    We review your site plan, soil type, and local frost depth to determine pier length, blade size, and the number of piers your deck or pergola needs.

  2. 2

    Pier Layout & Sizing

    Post locations are marked to match your framing plan, whether that's steel deck framing, aluminum deck framing, or a traditional wood post layout.

  3. 3

    Installation & Load Testing

    Each pier is screwed to depth using hydraulic equipment and load tested on site, confirming it's rated to carry your deck or pergola before any framing begins.

  4. 4

    Framing & Construction Handoff

    With piers set and verified, your crew or ours can move straight into deck construction or pergola installation without waiting on concrete to cure.

What We Offer

Explore More Framing, Fencing & Outdoor Living Options

Helical Pier Installation Across the Wasatch Front

We install and supply helical piers throughout the communities we serve from our South Salt Lake and Springville showrooms, matching the pier system to local soil and terrain in each area.

Free estimates, no obligation

Build Your Deck or Pergola on a Foundation That Lasts

Concrete footings take days to cure and can still heave with Utah's freeze thaw cycles. A helical pier foundation is installed, load tested, and ready for framing in a single visit, backed by a team that's been sizing Utah foundations since 1989.